Scope |
The company invites all prospective suppliers and contractors for EPIC for Replacement of Gas Heater Control Panel in PS2 and PS3.
Contractor shall provide the expertise, materials, specialized labour, supervision, test equipment, tools, documents, drawings and each and every item of expense necessary for the performance of engineering, procurement, installation, construction, pre-commissioning, commissioning, and testing associated with the replacement of the existing Fuel Gas Heater Control Panels at PS2 & PS3. Contract Duration shall be eighteen (18) calendar months.
|