Reference | HFY-CON/PR1134-1157 |
Date | 6/28/2021 |
Location | Middle East |
Scope | The company announces its need for Provision of Engineering, Procurement, Construction and Commissioning (EPCC) of Upgrade Electricity Network for the Vehicles Inside Halfaya Contract Area. (1) New built 11kV OHTL & 0.4KV OHTL, with all accessories. (2) 630A, 12KV, SF6, On-load dis-connector switch for tie-in point. (3) 11/0.4Kv, 250KVA Distribution Transformer, H-pole mounted with 2 LV protection panel (pole mounted) for each transformer, with all accessories. (4) 11 kV Lightning arresters & 11kV Link fuse with element fuse 20A. (5) MV and LV Cables and cabling. (6) Dismantle existing OHTL materials/equipment and return it to the warehouse of the Missan electric Office. (7) Earthing system, Civil/structure works & Survey work. (8) Site preliminaries, mobilization, office facilities at work site, site camp as per contract and demobilization. (9) Detail design, survey, materials procurement, construction and installation, commissioning, as-built document, final documentation and one-year warranty. |
Documents Price | US 100.00 |