Reference | TP-771-2021 |
Date | 7/27/2021 |
Location | Middle East |
Scope | The company announces its need for the design, procurement, fabrication, installation, testing, pre-commissioning, commissioning and start-up of off plot infrastructure for ABWTF. As part of this project, network expansion is required to transport produced water from pipelines to the location of ABWTF. Scope also includes necessary off-plot pipelines to receive recovered oil back to the facility from ABWTF recovered oil collection tank and pumps. |
Bid Bond | BD 5,000.00 |
Bond Validity | 150 days |
Documents Price | BD 100.00 |