Scope |
The company invites all prospective suppliers and contractors for EPIC for New Soft Starter Panels for RG Compressor Motors on NFA.
Contractor shall provide the expertise, materials, specialized labour, supervision, test equipment, tools, documents, drawings and each and every item of expense necessary for the performance of engineering, procurement, installation, construction, pre-commissioning, commissioning, and testing associated with the installation of new Soft-Starters for the RG Compressor Motors, 5101-KM-02/5102-KM-02, on NFA along with the associated Power & Control Cables after making space in the designated location in UTP by the demolition of the existing Hot Oil System related Control Panel & Transformers. Contract Duration shall be eighteen (18) calendar months.
|