Scope |
The company invites all prospective suppliers and contractors for Design, manufacture / fabrication, assembly, transportation, installation, inspection, testing, commissioning, handover and documentation of the complete Anti-surge controller. Supply Components to retransmit transmitter signals & common fault signals to Allen Bradley (AB) Central control PLC, Addition of RIO in AB PLC to accept the new signals, Configuration of AB central PLC HMI, Configure signals in existing serial interface to DCS, graphics in DCS, Cables, Wiring accessories as given below in the detailed Scope of Work.3.1.2.,, CONTRACTOR shall be responsible for the demolition/removal of the existing two (2) nos. of Anti-surge controller along with their wiring.
|