Reference | 012/SC/22 |
Date | 11/13/2022 |
Location | Middle East |
Scope | The company announces its need for Provision of Mess Hall Building Service in Camp 3#. Scope of work A new mess hall facility at camp No. 3 needs to be built to replace the old temporary canteen that has been used for more than ten years. The new mess hall building needs to be accommodated 150 people at camp No. 3. The EPC contractor shall review the basic design provided by Al-Waha and offer “Drawing Review Report” to the Al-Waha. On this basis, carry out the detail design, materials procurement and construction services. Contractor shall provide all construction materials, labor, tool, equipment, transportation and supervision to meet requirements of this contract. |
Bid Bond | US 15,000.00 |
Documents Price | US 100.00 |