Reference | HFY-CON/F&C1193-1216 |
Date | 8/25/2022 |
Location | Middle East |
Scope | The company announces its need for Provision of Engineering, Procurement, Construction and Commissioning (EPCC) of Base Camp 11KV System Upgrade. The Provision of Engineering, Procurement, Construction and Commissioning (EPCC) for Base Camp 11kV System Upgrade, which shall include but not limited to the following: - New 11 kV OHTL (11 Kilovolt Overhead Transmission Line) section – Backup power supply to OCC area. - Two New 11 kV switchgears by extending existing 11 kV BUS and modification of existing 11 kV incomer breakers for synchronising with new EDG (Emergency Diesel Generator) sets in Base camp sub-station. - Upgrade of existing EICS (Electrical Integrated Control System) in base camp sub-station. - LV Switchgear modification of Emergency Bus for provision of connection of additional backup DG set and auto loading of stabilising tower bottom pump in CPF3. - Backup Power Plant power connection optimization (FSF 1 and FSF 2 Areas). |