Upgrade of HFO Heater Honeywell Obsolete PLC & SCADA in RLIC
SCADA Systems
Reference LT22107000
Date 10/10/2022
Location Middle East
Scope The company invites all prospective suppliers and contractors for Upgrade of Control Systems for Heater, shutdown system of BMS 1&2 and HFO Export Pump of HFO Plant in Ras Laffan Industry City.

Contractor to carry out the Engineering, Design, Procurement, Installation and Commissioning to upgraded following obsolete systems at HFO facility in Ras Laffan:
(a) Honeywell PLC and SCADA Control Systems
(b) Shutdown system of existing obsolete Honeywell BMS 1 & 2 and
(c) HFO Export pump control panel with a Contract Duration of 8 month which includes 1 month mobilization period.

Bidding Information

Bid Bond QR 75,000.00
Bond Validity 150 days
Offer Validity 120 days
Documents Price QR 200.00
SCADA Systems
Related Prooducts: SCADA Systems Analyzers, Gas Calibration Equipment Density Detector, Gas Drilling Instruments Gas meters General Indicators and Recorders Level meters Liquid Measurement Monitoring & Control Pressure gauges/ Transmitters SCADA Systems Temperature gauges/ Transmitters Thermocouples Transmitters Transmitters, Pressure Viscosity Weighing Equipment
Related Tenders: Analyzers, Gas Calibration Equipment Calibrators, Electronic, Pneumatic Conductivity Meters Density Detector, Gas Dissolved Oxygen meters Drilling Instruments Gas meters General Indicators and Recorders Leak Locators Level meters Liquid Measurement Monitoring & Control Mud Logging Pressure gauges/ Transmitters SCADA Systems Temperature gauges/ Transmitters Thermocouples Thermowells Transmitters Transmitters, Pressure Viscosity Weather Station

Related Articles

For Buyers
Advertise your Purchasing Requests

For Suppliers
Promote your Products
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.