Scope |
The company announces its need for Supply of Neutral Earthing Resistor. The company is planning to install NCF 3 to 7 - (5) five wellhead compression stations at varying capacities since the NAG (Non-Associated Gas) wellhead pressure continues to decline across the Awali field. The company performed an in-house compression study considering current typical field installed compression units (Ariel KBT-4 compressor frame or similar mated to a Waukesha L7044GSI engine) to optimize both current and future compression staging requirements as the inlet pressure continues to decline while maintaining the required compression capacity.
|