Reference | TP-954-2022 |
Date | 11/7/2022 |
Location | Middle East |
Scope | The company announces its need for the Prequalification of Pressure Relief Valve (PRV). The scope of work for Manufacturer with respect to the Pressure Relief Valve shall include but not limited to: Design & Engineering, Manufacturing, Coating for Rust proof, Inspection by Third party Inspector, Documentation (like submission of MTC’s, procedures, ITP etc.), Testing, Shipping.. |
Bond Validity | 180 days |
Documents Price | BD 50.00 |