Reference | TP-0976-2022 |
Date | 12/11/2022 |
Location | Middle East |
Scope | The company announces its need for Supply of Fittings (Gas Distribution Network Station Debottlenecking Project). As part of completion of detail engineering of this project, the proposed LTCS and CS fittings are required to execute and complete the piping works within HMS station. As part of GDN debottlenecking project, the Company, Tatweer Petroleum intends to lay 28 24 inch combination of gas pipelines between Hidd Metering Station (HMS) to Alba Gas Station Jump over (AGS J O). |
Bid Bond | BD 1,000.00 |
Bond Validity | 180 days |
Documents Price | BD 50.00 |