Reference | 044/SC/22 |
Date | 12/4/2022 |
Location | Middle East |
Scope | The company announces its need for Provision of Oil Flowline Interpenetration with HDPE Service. - Item 001, 6" PE-100 HDPE lining pipe: API 15L, OD (159), WT (7),including repair for the leakage point, cleaning and scrapping inner wall of flowline. - Item 002, API 5L PSL2 BNS 6”x5.56mm, Seamless 3PE, Design pressure:4.0Mpa; Design temp: 85°C;operation pressure:0.8~1.8Mpa operation temp:25~51°C. |
Bid Bond | US 100,000.00 |
Documents Price | US 100.00 |