Reference | HFY-CON/F&C1221-1244 |
Date | 11/21/2022 |
Location | Middle East |
Scope | The company announces its need for Provision of EPCC for all AL- Zaki Concrete Bridge. Part I - Access Road (total length is about 353m): The access road is built to connect the existing road from new bridge. The carriage width is 15.5m with 1.5m sidewalk at both sides. Part II - New Kahla’a bridge (5x25m simple support T beam) as per the following: - Superstructure - Piles work. - Pier work and cross beam - Substructure - Deck slab with diaphragm deck slab reinforcement work - Pavement and sidewalk - Protection of river bank - Drainage of bridge - Bridge lighting system and foundation - Girder work including rebar, formwork, pouring concrete curing strand wire, transportation & installation and all the necessary work. According to the standards and specifications. Part III: Electrical work |