Reference | 27/2022 |
Date | 12/15/2022 |
Location | Africa |
Scope | The company announces its need for Replacement of GLRU Cooling water Return Line 36 inch. The Objective of this project is to replace the GLRU 36’ A2-502 underground cooling water return line at the L.N.G. Plant. A new line to be installed with five inspection pits and new corrosion equipment. (P.C. Contract) (As per details mentioned in the scope of work). |
Bid Bond | LD 90,000.00 |
Documents Price | LD 5,000.00 |