Reference | MTC-39/2022 |
Date | 1/10/2023 |
Location | Africa |
Scope | The company announces its need to Replace the Existing Cable 3Cx120mm² " 3.3kv " Ring Network Cable From the Power House Switch Board No.1 To Substations A , B & C At GC1 & Replace the power cable from Substations " C " to Substations " X " at Camp Area Sarir Field. The main work shall consist of but be limited to the Following: - Cable trench excavation and backfilling. - Installation of new cables, cable jointing and termination work. - Replace & upgrade the 3.3kv Substation A, B, C & X. With the latest Technology. - Contractor shall replace old Power Transformer 500KVA at substation "X” With New power Transformer 750KVA. - Check, test and commission the new installation. |
Bid Bond | 0.5% of the tender value |
Bond Validity | 60 Days |
Documents Price | LD 6,000.00 |