Reference | 03/2023 |
Date | 2/5/2023 |
Location | Africa |
Scope | The company announces its need for Survey of Subsea Pipeline Berth 3 & 4 at Ras Lanuf Terminal. Brief description of the project: • The contractor shall inspect the submerged shipping lines of Port 3 & 4 with a diameter of (42 & 48 inches) and a total distance of 8.5 km as shown in the sow, and provide a detailed reports on their condition. The work includes providing specialized technical manpower and providing the necessary equipment to obtain high quality data in accordance with the scope of work and standard safety regulations in accordance with IMO (STCW & SOLAS). |