Reference | ENG-116-2023-ATSH |
Date | 2/26/2023 |
Location | Africa |
Scope | The company announces its need for Provision of Export Pipeline and Receiving Station at Atshan Field. SCOPE OF WORK INCLUDES BUT NOT LIMITED TO: • The treated gas (dry gas) with maximum of 200 MMSCFD from Atshan field will be supplied via 24” 600# export pipeline (304KM approximately) to Ubari Power Plant (UPP • The gas receiving station (GRS) facility at Ubari Power Plant shall be equipped with followings equipment’s : o Knockout Drum o Coalescer o Water Bath Heater o Metering o HP Flare System with KOD o Drain System |