Reference | T.E-10006612-112-KNR-2023 |
Date | 2/11/2023 |
Location | Asia |
Scope | Hiring of engineering services for detailed review of electrical power system protection Coordination, ARC Flash Analysis, Design Bottlenecks and Reliability Enhancement at KPD TAY Plant”. |