Reference | GT23105000 |
Date | 6/12/2023 |
Location | Middle East |
Scope | The company invites all prospective suppliers and contractors for EPIC for Early Site Preparation Works for NGL-5. Scope of Work includes detailed engineering, procurement, inspection & testing and construction relating to the early site preparation works for NGL-5 Plant, as summarized below: a. Underground and Topographical site survey b. Procurement of backfill material from QatarEnergy approved supplier. c. Earthworks including excavation, backfilling, sub-grading, and grading of NGL-5 area to the elevation of +1.5m QNHD as per approved drawings and specifications. d. Detailed Engineering, procurement, Inspection & testing, construction of access roads. e. Detailed Engineering, procurement, Inspection & testing, construction of fencing and gates. The site is open low-lying land, located within Messaid Industrial Complex on the south of the existing QatarEnergy Tank farm and Refinery, and north of the existing Station-S in Mesaieed, Qatar. The shoreline is approximately 2 kilometres southeast of the construction site. The proposed NGL-5 Plant platform is approximately 800,000 m2 area. |
Bid Bond | QR 1,100,000.00 |
Bond Validity | 150 days |
Offer Validity | 120 days |
Documents Price | QR 500.00 |