Scope |
The company invites all prospective suppliers and contractors for Tie in for NFA Control Board and N2 Turbo Expander. Contractor shall provide expertise, materials, specialized labour, supervision, test equipment, tools and every item of expense necessary for performance of N2 purge tie-in by providing piping/tubing connections between N2 control board and plant N2 supply, low pressure flare, atmospheric vent, and turbo expander casings on both Train-1 and Train-2 Turbo Expanders along with instrumentation and electrical wiring tie-in connection for the N2 supply solenoid valve and instrument wiring tie-in for both N2 vent flow transmitters at NFA. Contract Duration shall be thirteen (13) calendar months.
|