Reference | HFY-CON/F&C1266-1289 |
Date | 5/29/2023 |
Location | Middle East |
Scope | The company announces its need for Provision of Repair of CPF2 Buffer Tank (T-24330A). The main SOW includes but not limited to the following: 1. Replace Tank Bottom; 2. Repair Tank Internal Components; 3. Replace Soil Under Tank Bottom; 4. Repair of Coating; 5. Repair of Cathodic Protection; 6. Installation of an underground 8”GRE pipeline. |