Reference | LT24100700 |
Date | 2/8/2024 |
Location | Middle East |
Scope | The company invites all prospective suppliers and contractors for Provision of 3D Seismic Pre-Stack Depth Migration Processing and Seismic Inversion Services for Maydan Mahzam Field. Contractor shall provide QatarEnergy with all management, services, supervision, testing, computing facilities, software, support facilities, associated services, technology, Contractor Personnel, deliverables and each and every item of expense necessary for the provision of 3D Seismic PSDM Reprocessing and Seismic Inversion Services. Contractor shall perform the Services, including all standards, specifications and requirements, for QatarEnergy, in two (2) phases: a. Phase 1 - PSDM (Pre-Stack Depth Migration) Seismic Processing b. Phase 2 - Deterministic and Stochastic Inversion, with either: i. Option A: Post-stack deterministic and stochastic inversion ii. Option B: Elastic deterministic and stochastic inversion The start of Phase 2 shall include testing of the feasibility and effectiveness of Option A versus B. This shall include a milestone assessment by QatarEnergy to decide which option for the inversion would yield the intended VOI (Value of Information). Hence, QatarEnergy shall inform Contractor of the selected option to proceed as production. Contractor shall perform the Services using the latest geophysical technology Contractor shall fulfil the QA/QC and testing requirements, including documentation (PPT and/or PDF) and actual data output (SEGY) in standard format readable by PETREL interpretation software. Contractor shall complete the Services within duration of twenty-four (24) months from the Effective Date. |
Bid Bond | QR 80,000.00 |
Bond Validity | 150 days |
Offer Validity | 120 days |