Reference | 01/2024 |
Date | 2/20/2024 |
Location | Africa |
Scope | The company announces its need for Replacement of Underground Cooling Water Lines P.C Power Station. The work includes Mechanical, Civil jobs and very small quantity of Instrument Job. It involves excavation, removal of old pipes, casting of civil foundation & trenches, erection of pipe supports, fabrication/installation of new pipes, installation of Flow meter & Temperature Gauge, testing, painting and commissioning of the system. The location is within the running Power Plant in the Petro Chemical Complex of the COMPANY, commonly referred to as Industrial Area 2, in Marsa El-Brega. And the work has to be executed while the plant is running. CONTRACTOR shall take all safety precautions so that the work is executed without hindering plant operation or causing any safety hazards to the personnel involved. |
Bid Bond | LD 50,000.00 |
Documents Price | LD 5,000.00 |