Reference | PRE-0629-2024 |
Date | 4/4/2024 |
Location | Middle East |
Scope | The company announces its need for Provision Pre-Qualification for Cable Management Systems. The scope of work for Manufacturer with respect to the Cable management system shall include but not limited to Design & Engineering, Supplier & Sub Supplier Drawing Review Manufacturing & Testing, Documentation and Drawings. In addition to above mentioned details, Applicant to meet the Bapco Upstream Specifications, site design and data condition attached to the Prequalification documents. |
Offer Validity | 90 days |
Documents Price | BD 50.00 |