Reference | PRE-0633-2024 |
Date | 4/4/2024 |
Location | Middle East |
Scope | The company announces its need for Provision of Building Fire Alarm System. The scope of work for Manufacturer with respect to the Building Fire Alarm System shall include but not limited to Design & Engineering, Supplier & Sub Supplier Drawing Review Manufacturing & Testing, Documentation and Drawings. In addition to above mentioned details, Applicant to meet the Bapco Upstream Specifications, site design and data condition attached to the Prequalification documents. |
Offer Validity | 90 days |
Documents Price | BD 50.00 |