Scope |
The company announces its need for Provision Supply of fittings. As mentioned above these materials are required to implement the advance tie in Scope for the Debottlenecking Pipeline project inside the CGDF plant. The objective is modify the facility during the Jan 2025 Turn around, when the plant will be under shut down and make the necessary spool modifications and install the advance tie in valves and spectacle blinds as per the scope indicated in the respective P&ID;s. All pipes fittings, flanges, valves and stud bolt and nuts and gaskets are envisaged to complete the Tie in works as listed in this MTO sheet and are required on site by the end of December 2024.
|