Scope |
The company announces its need for Supply of 24 and 32 inch pipes required for the regasified liquid natural gas project (RLNG). The company aims to lay 2 x 24 inch pipelines of regasified liquid natural gas (RLNG) between Alba Gas Station Jump Over to Al Durr Distribution Point. As part of phase 2 scope, Bapco upstream will be installing above ground 2 x 24 inch pipelines from Asker Valve Station to Hafeera Valve Station and Hafeera Valve Station to Al Durr Distribution point. In addition to the pipeline, a new intermediate valve station – Hafeera Valve station will be constructed as part of phase 2 scope.
|