Scope |
The company announces its need for Supply of Emergency Shutdown Valve (Regasified Liquid Natural Gas project) (RLGN). The company aims to lay 2 x 24inch pipelines of regasified liquid natural gas (RLNG) between Alba Gas Station Jump Over to Al Dur Distribution Point (DDP) including two new stations Askar Valve Station (AVS) and Hafeera Valve Station (HVS). For the execution of Instrumentation works, it is required to procure the 24inch Shutdown Valves as per project specification attached along with this tender package. The proposed 24inch Shutdown Valves are required for (Alba Gas Station Jump Over, Askar Valve Station, Hafeera Valve Station, Al Dur Distribution Point). As part of phase 1B scope, Bapco upstream will be installing above ground 2 x 24inch pipelines from Alba Gas Station Jump Over to Askar Valve Station. In addition to the pipeline, a new intermediate valve station, Askar Valve station will be constructed as part of phase 1B scope. As part of phase 2 scope, Bapco upstream will be installing above ground 2 x 24inch pipelines from Askar Valve Station to Hafeera Valve Sta
|