Scope |
The company announces its need for Supply of Engineered Instrument Air (IA) Package. The main purpose of this project is to supply the Instrument Air (IA) system instead of the existing Instrument Gas (IG) system to improve the reliability of the instruments equipment in the facilities. At present Instrument Gas (IG) is used in all the Legacy Well Manifolds where there are no standardized arrangements like dryers, filter etc for removing the condensate from the gas failing which the equipment are corroded and damaged thus badly affected the reliability of those equipment as well as caused high OPEX. Hence, to eliminate such problems, this project is taken up which will be executed on different ways and in different phases.
|