Construction of Two New 48MW Substations
Electrical Supplies
Reference BID9319
Date 10/7/2009
Location Middle East
Scope Ref. No.: RFP-1634
Issue Date: 07-Oct-2009
Pre-Tender Meeting Date: 19-Oct-2009.
Bid Closing Date: 10-Nov-2009
Bid Bond: 100,000 Kuwaiti Dinars.
Fee: 300 Kuwaiti Dinars deposited in the Company’s Account No. (50112130101) with the National Bank of Kuwait, Ahmadi Branch, Kuwait; or a money transfer to the Company’s bank account (50112130101) with National Bank of Kuwait, Ahmadi Branch, Kuwait, Swift Code NBOKKWKW; or a bank draft payable to Kuwait Oil Company.

Scope of Work:
The works comprise two portions as follows:
- Portion 1:
Installation of New MNG-1 48MW substation in Minagish Area West Kuwait.

Construct a new 11 kV MNG-1 elevated substation with a capacity of 48MW adjacent to New GC-16 facility. The New MNG-1 Substation building shall include a switchgear room, control and relay room, battery room, telecom room, cable basement and office accommodation, all as more detailed in the Technical Specification of the Contract. The new MNG-1 substation building shall be constructed adjacent to the proposed new 132 KV MNG-D 48MW substation to be built and constructed by other contractors.

The overall Works for both substations shall be duly coordinated between the respective contractors to ensure proper integration and interface of the MNG-1 11 kV substation with the 132 KV MNG-D substation. The coordination and proper integration for the two substations are deemed to be included in the contract, unless specifically indicated with the term by “others” in the contract documents.

- Portion 2:
Installation of New MNG-2 48MW substation in Umm Al-Gudair Area West Kuwait

Construct a new 11 kV MNG-2 elevated substation with a capacity of 48 MW in the Umm Al-Gudair Area (North of GC 27). The new MNG-2 Substation building shall include a switchgear room, control and relay room, battery room, telecom room, cable basement and office accommodation.

The new MNG-2 substation building shall be constructed adjacent to the proposed new 132 KV MNG-E 48MW substation to be built and constructed by other contractors. The overall works for both substations shall be duly coordinated between the respective contractors to ensure proper integration and interface of the MNG-2 11 kV Substation with the 132 KV MNG-E substation.
Electrical Supplies
Related Prooducts: Electrical Supplies Batteries Cable Trays Cables Cathodic Protection Contactors Control Panels Earthing materials Electric fittings & junction box General Lighting Panel Components Switches Transformers Umbilical Lines
Related Tenders: Accumulators and Storage batteries Batteries Cable Trays Cables Cathodic Protection Circuit Breakers Contactors Control Panels Earthing materials Electric fittings & junction box Frequency Inverter General Lighting Panel Components Starter Switches Transformers Umbilical Lines UPS

Related Articles

For Buyers
Advertise your Purchasing Requests

For Suppliers
Promote your Products
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.