Reference | BID9351 |
Date | 10/7/2009 |
Location | Middle East |
Scope | Ref. No.: 74-09-4070 Issue Date: 07-Oct-2009 Bid Closing Date:15-Nov-2009 Offer Validity: (120) days from the Bid Closing Date Bond Validity: (90) days from the Bid Closing Date Fee: 600 USD Bid Bond: 1% From the total value of tender price Scope of Work: The mobile well testing facilities for South Oil Company's various fields in Iraq has been designed to efficiently and safety test wells of up to 15,000 bbl/day of fluids, up to 30,000 MM SCFD of gas (GOR of 2000) and with a water – cut of 60% the mobile testing facilities would include a choke manifold, test separator, test tanks, transfer pumps, road tankers and off-load pumps, meters, and utility systems as following: 1- Supply # 2 lots of process equipment carrier #1 includes: Emergency shutdown valve, choke manifold, test separator (with water cut treatment facility if needed), flow control manifold, and trailer equipment carrier #1. 2- Supply # 2 lots of process equipment carrier #2 includes: Test tnak#1, crude oil transfer pumps#1, and trailer equipment carrier #2. 3- Supply # 2 lots of process equipment carrier #3 includes: Test tnak#2, crude oil transfer pumps#2, and trailer equipment carrier #3. 4- Supply # 2 lots of process equipment carrier #4 includes: Diesel generator, instrument air compressing system, control / operation building, and trailer equipment carrier #4. 5- Supply # 2 lots of transportation equipment includes: Crude oil tank trailers, crude oil off-loading pumps, crude oil metering, and Mercedes Benz truck tractor units. 6- Supply # 2 lots of additional equipment includes: Loading header skid, interconnecting pipe work and hoses, site lighting, and control system. 7- Supply # 2 lots of auxiliary equipment list includes: Surface data acquisition system, emergency respiratory, H2S personnel monitoring, and special tools and consumable parts. 8- Supply # 2 lots of recommended spare parts for all above items for one year (detailed in offer). 9- Supply # 2 lots of documentation: complete documentation for drawing, fabrication, testing and inspection (third party inspection required). |