Egypt Zones accountACCOUNT
Supply of Turbogenerators
Turbines: Gas
Reference PREQ ON-101
Date 2/28/2012
Location Asia
Scope Supply of 4 gas Turbogenerators for power generation.

Each turbogenerator supply package shall include:
Gas turbine.
Gearbox.
Electrical Generator.
Control system.
Fire fighting system (CO2).
Fuel and air feeding package.
Combustion products exhaust package.
Starter.
Noise suppressing enclosure.

Turbogenerator main specifications:
- Nominal electrical power at the terminals of turbogenerator 1,8-2,5 MW.
- Voltage at the terminals of turbogenerator — 10 kV.
- Type of manufacture — container, high grade of manufacture, for outdoor installation.
- Operating temperature range: -40...+40°C.
- Fuel — natural gas (GOST 5542-87).

Bidding Information

Turbines: Gas
Related Prooducts: Turbines: Gas Diesel Engine Engine Parts General Generating Sets Generators Marine Diesel Engine Power Pack Turbines (General) Turbines: Gas Turbines: Hydro Turbines: Steam
Related Tenders: Diesel Engine Engine Parts General Generating Sets Generators Marine Diesel Engine Power Pack Turbines (General) Turbines: Gas Turbines: Steam

Related Articles

For Buyers
Advertise your Purchasing Requests

For Suppliers
Promote your Products
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.