Scope |
Contractor shall carry out the Front End Engineering Design (FEED) and related services to design a Hazardous Waste Incinerator (HWI) within the premises of the existing Hazardous Waste Treatment Centre (HWTC) at Mesaieed Industrial City (MIC), Qatar including complete facilities supporting operation of Hazardous Waste Incinerator (HWI). HWI Facility will be used for treatment and disposal of incinerable hazardous waste produced in the State of Qatar. The Incinerator Facility shall meet Qatar Ministry of Environment (MoE) regulations and EU standards with respect to emissions. |