Reference | BID902834 |
Date | 4/7/2014 |
Location | Africa |
Scope | Prequalification Of Specialized Companies For to supply and install a new Gas Turbine at Azzawiya Oil Refining Co: Azzawiya Oil Refining Company Inc. (ARC), the Owner, intends to supply and install a new compact, heavy-duty, dual fuel, 10MW/6.6KV Gas Turbine (GT) Electric Power Generating Unit complete with process steam cogeneration combined cycle. 1- Brief of Scope of Works: - The Basic Scope of Works required for the supply and installation of the new GT shall include the followings:- - Design, Engineering and Documentation. - Manufacturing and supply of the GT and the process steam cogeneration unit and assembling of internals and testing at Manufacturer’s work shop. - Site Installation, erection Works & erection supervision, including all utility battery limit connections of electrical, fuel, steam, water utilities. - Commissioning, start-up and test-run and field performance tests. - ARC personnel staff training. 2- Documents to be Submitted for the Prequalification: - Licenses for carrying out company activities in Libya. - Valid Local Tax Payment Certificate. - Statement of company’s financial status for the last three years. - Company’s technical organization chart, list of technical stuff and equipment. - Certificates of Completion for similar projects in the past. - Contact details of the company’s head office and branches i.e. telephone/telefax numbers, email identities, website. - List of past and current projects executed by the company with locations, contract prices etc. - Subcontractors, if any and their experience and other information related to them. - Authority letter from the parent company in the event of prequalification of a branch or partner company. - In case of joint venture between foreign and Libyan company, foreign company must be registered with the local authority in Libya and have the permission to execute works in Libya. |