Reference | TB-3214 |
Date | 12/16/2014 |
Location | Africa |
Scope | Provision of Waste Management Services. Contractor must be able to provide Handling Equipment, Transportation, Treatment and Stabilization for Drilling Waste Management Services including but not limited to the following: - Equipment to handle drill waste (cuttings, contaminated soil and all drilling fluid wastes) at the rig location; - Sealed/Leaked proof containment for safe drill waste; - Safe transportation of drill waste to Contractor’s treatment site; - Remediation and clean-up of drill site after rig release; - Treatment of Synthetic Based Mud (SBM) and Water Based Mud (WBM) drill cuttings, contaminated soil & liquids; - Recover of drill fluid after treatment of waste with Thermal Desorption Unit [TDU]; - Approved waste disposal site for treated SBM cuttings and liquids. ? All necessary consumables and spare parts; and All other related equipment, tools and experienced personnel necessary to satisfactorily perform the above services. |