Reference | BID910257 |
Date | 7/23/2016 |
Location | Africa |
Scope | The company announces its need for supply of the existing aged gear box of the gas Turbine TB-5000 (first stage) and the existing aged gear box of the gas Turbine TB-5000 (Second and Third stages). |