Reference | PRQ/724/MCX/18 |
Date | 2/8/2018 |
Location | Africa |
Scope | The company announces its need for Overall Integrated Power Management System at Mellitah Complex. Scope of Work The scope of work is to upgrade and enhance the electrical power system to provide complete Overall Integration Power Management System (OIPMS) at Mellitah Complex, the required work shall include the following :- - Site Survey. - Carry out detailed engineering required to upgrade/replace the existing electrical control system (ECS) to provide complete Overall Integration Power Management System for Mellitah Complex Power plant. - Detailed specification and document update and PLCs programming and associated tests. - Procurement, Inspection, Factory testing. - Transportation, Insurance, Loading and unloading of material manufacturing at Mellitah Company B.V. Libyan Branch site/ store. - Compliance of check list points during FAT,SAT and store. - Installation, Pre-commissioning, commissioning, start-up with hardware and software packages. - Final tests, operation acceptance test and products warranty. - Issuing all required certifications. |