Reference | MTC-36/2018 |
Date | 7/3/2018 |
Location | Africa |
Scope | The Company is initiating a project to replace three hundred ninety seven (397) Numbers of the deteriorated wooden poles, located in the different location of the Sarir-Messla 33Kv Electrical Transmission Line rings with Company supplied steel poles and provision, installation of twenty two (22) pieces of outdoor switch disconnectors on the required location of the transmission lines to isolate the poles for replacement and avoid production lost. |