Reference | HFY-PUR/F&C1059-1046 |
Date | 5/4/2020 |
Location | Middle East |
Scope | The company announces its need for Purchasing of 3X30 MW Gas Turbine Generator Package. PART-A: Supply of Goods covers: Procurement of Gas Turbine Generator 3x30MW including Air intake, Exhaust ducts and stack, Turbine Core Engine, Gearbox, Generator, Lube oil system, Fuel gas system, Ventilation system, Water wash skid, Control system, Air Intake, Gas Control Skid etc. Auxiliaries, Special tools, Commissioning and start-up consumable material, Test and Inspection, Assembling, Factory training, etc. Installation supervision, pre-commissioning, start up, commissioning, site training and hand over. PART-B: Long Term Support Service includes: Residence Service Advisor, On Call Field Service team, Remote Diagnostic Support (RDS) & Long Term Spares. |
Documents Price | US 500.00 |