Reference | RC 2974 |
Date | 1/28/2015 |
Location | Africa |
Scope | The Scope ofwork shall include but notlimited to the following activities: - Soil Investigations - Earthworks - Foundation Piling - Concrete works including construction of Cellar Slabs and Pits, Extension Slabs, Waste Pits, Drainages, Corral Walls/Cutting Treatment Areas, Chemical Shed, Cement Unit Areas, Footings, Generator Slabs, Diesel Tank Slabs, Surfacing for Location circulation area,OilTraps,etc. - Ancilliary Facilities Construction including Manholes, Soak AwayPits and SepticTanks,Fencing,etc. - Excavation,shaping and lining of waste pits including discharge drainsfrom slabbed area and covering shed for pits according to DPR requirements. Water Borehole Construction. - Main Roads Construction. |