 | Construction Upgrade of Awali Hospital South East SE Wing
 |
 | Site preparation, Earthworks, Road works and Construction of new Fire School Building
 |
 | Construction of Two Nos of Evaporation Ponds and Replacement of Running Tracks in Mic
 |
 | Approach Road to Qadirpur Wells (QP-10, HRL-14, QP-01 & HRL02)
 |
 | Construction For Upgrade of Existing Refinery Chemical Stores
 |
 | Provision of Building Communication Tower at OGM5 of Ahdeb Oilfield
 |
 | Provision of Demolition and Re-construction for AlMabahij Primary School
 |
 | Construction of En-Route Piquets outer Side of Wali Dehydration Plant
 |
 | Provision of Constructing Qasr Rabee'a Road in Al-Ahrar
 |
 | Basic Studies, Designs, and Detailed Drawings with Bill of Quantities
 |
 | Purchase of Material for Fencing of Pit#1, Pit#2 and Pit#3 near Dakhni Plant
 |
 | Construction of mcc, ccr, Dispatch Offices, Security Room, Car Parking Shed
 |
 | General Construction Services
 |
 | Supply of Construction Material for Hard Standing of Area near Palletizing Unit of Sakhni Plant
 |
 | Construction of En-Route Piquets Outer Side of Wali Dehydration Plant
 |
 | Construction of 04km Road
 |
 | Construction of RCC Drains & Hard Standing at Uch-ii Plant
 |
 | Construction of Black Top Road Inside Togh Condensate & Gas Field, Distt kohat
 |
 | Supply of Low Temperature Retarder
 |
 | Construction of Perimeter Fence & New Patrol Roads at RLIC
 |
 | Services for Construction Management at PSO ZOT Installation
 |
 | Construction of Record Room
 |
 | Construction of Security Guard Room
 |
 | Construction of Masjid Hall at Logistic Cementation Base
 |
 | Construction of Dyke Wall for Crude Storage Tanks
 |
 | Construction of Water Bound Macadam (WBM) Area
 |
 | Construction of Mesh Wire Fencing
 |
 | Construction of the Extension of the Existing Core Samples Store
 |
 | Construction of Truck Wash Facility
 |
 | Services for Construction Management of Storage Tanks and Allied Facilities
 |
 | Construction of CF Site M/s DHA Filling Station Islamabad Division
 |
 | Construction of Mesh Wire Fencing
 |
 | Construction of Water Bound Macadam (WBM) Area
 |
 | Construction of Record Room
 |
 | Construction of 03 no. Classrooms
 |
 | Implementation of Various Infrastructure Works
 |
 | Construction of Flare Gas Recovery Unit
 |
 | Design, Equip and Implement Separate Infrastructure Works Projects
 |
 | Construction of 20 Housing Unit Blocks (PC)
 |
 | Construction of Concrete Trench for Electricity
 |
 | Construction of 02 Nos. Steel Structure External Emergency Stairs
 |
 | Rehabilitation of 02 km Road from Pindi Road
 |
 | Construction of Flare Gas Recovery Unit
 |
 | Construction of the New Air-cooled Chiller Plan
 |
 | Supply, Fabrication and Erection/Construction of Parking Shed
 |
 | Provision of Constructing 100-Bed Isolation Center
 |
 | Establishing Roof of the Chemical Store
 |
 | Establishing Workshop Outlet
 |
 | Development of the Governmental Muthanna Fuel Station
 |
 | Establish Cold Store for the Receiving and Shipping Division
 |
 | Establishing Store for Chemicals in Al Samawah Refinery
 |
 | Construction of Two-storey Building
 |
 | Construction of Central Nor Facilities
 |
 | Reconstruction of 01 No RCC Column of Main Gate
 |
 | Construction of Drainage System
 |
 | Equipment Foundation and Structure Repairs at Slug Catcher & Peco Filters
 |
 | Constructing Wassit Oil Division Restroom
 |
 | Pavement and Cut off Drain Work
 |
 | Construction of Clinic Doctor's Lounge
 |
 | Supplying Building & Equipment Maintenance Materials
 |
 | Provision of Site Preparatory Works
 |
 | Construction of Stone Pitching and Fencing
 |
 | Construction of Residential Complex of (200) Houses in the Karbala Refinery
 |
 | Construction of Head Count Room with Veranda
 |
 | Construction of Multi-Storey Carpark at West Bay
 |
 | Construction of New Fencing
 |
 | Establish New Plant Produce Hydrochloric Acid (HCl) and Associated Materials
 |
 | Construction of Boundary Wall
 |
 | T-Wall Supply and Transportation
 |
 | Pavement Works in CPCL Green Belt Site
 |
 | FO and Asphalt Reclaiming Jobs
 |
 | Construction of Canal Drain in Green Belt Development Site
 |
 | Construction of Protection Wwall
 |
 | Repair/Renovation of Dispensary and Construction of Boundary Wall
 |
 | Construction of CF Site Bolan Filling Station
 |
 | Raising of Existing and Construction of New Boundary Wall
 |
 | Construction of Access Road, Oil Water Separator, Checking Bay and Allied Works
 |
 | Construction of G+1 Storeyed Office Building
 |
 | Construction of 675 mtr long Brick Boundary Wall
 |
 | Construction of Two (02) nos. of RCC Security Watch Tower
 |
 | Supply of Permanent Fence Booms For GB103-LNG1
 |
 | Hiring of services for Repairing of Road
 |
 | Construction of Boundary Wall and Barrication
 |
 | Chain Link Fence for Barrication
 |
 | Construction of Street Pavement and Drains
 |
 | Construction of Worker Room
 |
 | Supply of Insulating Fire Bricks and Bonding Mortar
 |
 | Construction of Boundary Wall
 |
 | Construction of Washroom Block and Bore Well
 |
 | Construction of Rigid Pavement
 |
 | Construction of Boundary Wall and Drain Channel
 |
 | Annual Rate Contract (ARC) for Scaffolding Jobs
 |
 | Construction of Gravel Approach Road
 |
 | Construction / Repairing of Approach Road
 |
 | Work Base Infrastructure
 |
 | Construction of Retaining Wall
 |
 | Repair/Replacement of Fencing at Wells Pasakhi # 3 & 4
 |
 | Construction of Security booth, Rest room, Rcc
 |
 | Providing and Laying Stone Tiles on Front Wall
 |
 | Construction of Security Guard Room
 |
 | Construction Protective Piles for Unexposed Pipelines
 |
 | Construction of Brick Boundary Wall
 |
 | Construction of Flare PIT Wall
 |
 | Repairing of Approach Road
 |
 | Supply of Muffle Block - Brick Quarl
 |
 | Construction of Guard Room
 |
 | Construction of Boundary Wall
 |
 | Construction of Car Parking in Compressor Station
 |
 | Supplying Different Construction Material
 |
 | Construction of D/Site
 |
 | Construction of Security Guard Room
 |
 | Construction of Signature Gate
 |
 | Construction of RCC Floor
 |
 | Earth Filling & Construction of 75 Nos RCC Pipe Sleepers
 |
 | Construction of 02 x Semi Covered Sheds
 |
 | Construction of PCC Pavers
 |
 | Construction and Implementation of a Basement
 |
 | Construction of SPAN-K Shed
 |
 | Construction of Record Room
 |
 | Blacktopping of Operational Road
 |
 | Construction of Boundary Wall
 |
 | Construction of RCC Foundation
 |
 | Renovation/ Construction Work of Security Barrack
 |
 | Pavement Work and Construction
 |
 | Road Works
 |
 | Construction of Control Room Building
 |
 | Construction of Production Hookup Works
 |
 | Supply, Fabrication, Installation and Commissioning of Electro-Hydraulic Road Blocker
 |
 | Construction of Two Rooms
 |
 | Structural Beam
 |
 | Dismantling, Fabrication & Installation of M.S Roof Plates, Rafters, Steel Structure
 |
 | Remodeling of CF Site Al-Farooq Filling Station
 |
 | Construction of Boundary Wall
 |
 | Construction of CF site M/s Green Filling Station
 |
 | Construction of Boundary Wall, Razor Wall
 |
 | Construction of Into Plane Facility Parking Area
 |
 | Construction of Record Room
 |
 | Construction Protective Piles for Unexposed Pipeline
 |
 | Construction of Central NORM Facilities
 |
 | Construction of a Retail Fuel Station
 |
 | Construction of a Retail Fuel Station
 |
 | Provision and Installation of Tension Fence
 |
 | Reclamation & Protection Works
 |
 | Construction of LPG Recovery Office Building
 |
 | Provision of General Construction Services
 |
 | Constructing 4 Residential Houses
 |
 | Construction of Approach Road, Plinth, Road Over Plinth, Effluent Pit
 |
 | Construction of Bituminous Approach Road
 |
 | Construction a School
 |
 | Construction of Residential Complex
 |
 | Construction of 20 Residential Houses
 |
 | Construction of Dust Free Road
 |
 | Construction of Peripheral Storm Water Drain
 |
 | Construction of Gasoline 2 Control Building
 |
 | Upgrade of Halul Landing Area
 |
 | Raising The Floor Level of Surface Covering Underground Tank
 |
 | Applying Water Proofing Surface on Terrace Slab
 |
 | Construction of Dyke Wall
 |
 | Empanelment of Civil Engineering Contractors Service
 |
 | Construction of Record Room at Machike Installation
 |
 | Construction of Record Room at Faqirabad Depot
 |
 | Supply of 1st Class Timber, Bricks, Sand and Broken Stone
 |
 | Construction of Plinth for VFD-2 New
 |
 | Construction of Approach Road, Effluent Pit, Drainage, Plinth & Foundation
 |
 | Frame Contract for Construction Services
 |
 | Construction of Boundary Wall
 |
 | Construction of Additional Warehouse and Shed
 |
 | Construction of Field Accommodation Blocks
 |
 | Construction of CF Site M/S Green Filling Station
 |
 | In /Out Driveway Asphalt Carpeting
 |
 | Alwaha Club Gym Expansion
 |
 | Construction of Civil Supports
 |
 | Construction 01 No. 2000 MT and 01 No. 800 MT Tanks
 |
 | Supply and Installation of Pavers
 |
 | The 3rd Floor of FOD Administration Building Renovation
 |
 | Construction of Spiral Staircase
 |
 | Construction of Ramp for Shunting of Tank Lorries
 |
 | Construction of Field Accommodation Blocks
 |
 | Construction of Ramp
 |
 | Construction of Roads to Airport and Inside Field
 |
 | Paving of the Courtyard and the External Roads
 |
 | Caustic/Chlorine Plant in khur Al-zubar
 |
 | Partenership Contract Custic / Chlorine Plant
 |
 | Construction of the Department of Geology
 |
 | Construction of CF Site M/S DHA Filling Station Islamabad Division
 |
 | Provision of Scaffolding Services
 |
 | Construction of Water Pipeline Replacing Old Network
 |
 | Construction of 06 Nos. Watch Tower and Toe Wall
 |
 | Construction of Dyke Wall with Safety Railing, Access Road and Cross Over Platforms
 |
 | Canteen Building Construction
 |
 | Construction of Gas Station of Al Azza
 |
 | Construction of 01 no. Jet A-1 Storage Tank
 |
 | The 3rd Floor of FOD Administration Building Renovation
 |
 | Constructing Buildings
 |
 | Construction of the Communications Building
 |
 | Construction of Laboratory Building
 |
 | Construction of 01 no. Jet A-1 Storage Tank
 |
 | Construction of Control Room Building
 |
 | Shifting, Installation and Commissioning of RTG System
 |
 | Al-Musharrah Bridge Rebuild
 |
 | Construction of 600 KL New Fire Water Tank
 |
 | Compound Wall Construction
 |
 | Construction of Control Room Building
 |
 | Construction of Asphalt Road Patch Work
 |
 | Construction 01 No. 2000 MT and 01 No. 800 MT Tanks
 |
 | Construction of Laboratory Building
 |
 | Installation of Underground Fuel Storage Tank
 |
 | Construction of Security Watch Tower
 |
 | Construction of 02 Nos Security Watch Towers
 |
 | Fabrication and Erection of Walk Way at KTA
 |
 | Construction of Pavement for Driveway
 |
 | Construction of Oil Water Separator, Boundary Wall and Security Watch Towers
 |
 | Construction Works
 |
 | Construction of Boundary Wall & 02 Nos Watch Towers
 |
 | Construction of Boundary Wall
 |
 | Construction of Additional Bouzer Decantation Facility & Miscellaneous Works
 |
 | Providing and Fixing of Fencing
 |
 | Raising Height of Boundary Wall & Construction of Drain Collection Pit
 |
 | Construction of Three Duct Banks
 |
 | Construction Works
 |
 | Project and Construction of Residential Block
 |
 | Provision of Construction Support Services
 |
 | Employees Dormitory Building Construction
 |
 | Demolition of Old Buildings
 |
 | Construction of Expansion of Mesaieed Record Centre
 |
 | Construction of 08 New Earth Pits and Repairing of 28 Pits
 |
 | Security Facilities Construction and Maintenance
 |
 | Purchase of Hazardous Material Storage Buildings
 |
 | Provision of Access Road and Well Pad Construction Services
 |
 | Annual Rate Contract for Construction/ Re-modelling
 |
 | Construction Corporate Information Rooms
 |
 | Additional Construction Works
 |
 | Construction of Building for Pipes & Welding Department
 |
 | Additional Construction Works at M/S CANTT F/S, Multan
 |
 | Additional Construction Works
 |
 | Well Pads construction (The Fifth Batch)
 |
 | Constructing of (2) Open Shelters
 |
 | Various Road Build and Maintenance
 |
 | Construction of Storm Water Drain
 |
 | Additional Construction Works
 |
 | Provision of Construction of Flow Lines and Trunk Lines (2018-2021)
 |
 | Construction of Control Room
 |
 | Stocking & Supply of Wooden Pallets
 |
 | Construction of Well-Pad P25 and Access Road
 |
 | Misc Works for Fabrication of Foundation
 |
 | Additional Construction Works
 |
 | Construction of Permanent Access Control
 |
 | Purchase Structure Material & Consumalbe Material
 |
 | Additional Construction Works
 |
 | Relaying of Pavers at Diffrent Area
 |
 | Additional Construction Works at M/s CANTT F/S, Multan
 |
 | Construction of Boundary Wall & Walkway
 |
 | Construction of Boundary Wall at BOT
 |
 | Construction of Boundary Wall at ZOT
 |
 | Establishment of an Extension Building to Improve Control of Petrol / 2
 |
 | Construction of Boundary Wall at Shershah Depot
 |
 | Construction of Boundary Wall at Shikarpur
 |
 | Re-Installation / Relaying of Pavers at Shikarpur Terminal
 |
 | Provision of GES Service
 |
 | Set up Stores of Radioactive Materials
 |
 | Construction work at M/S PSO 9 F/s
 |
 | Call-Off Contract for Scaffolding Services
 |
 | Provision of Construction Services
 |
 | Construction of Roads and Well Pads
 |
 | Construction of Parking Sheds
 |
 | EPIC of Walkover Bridges & Walkways
 |
 | Provision of Maintenance and Construction Support Services
 |
 | EPIC of Various Road Upgrading Works
 |
 | Constrution of Flowlines and Associated Works
 |
 | Civil Works and Maintenance
 |
 | EPIC of Precast Dust Barriers
 |
 | Construction of New Permanent Accommodation
 |