Reference | MTC-25/2018 |
Date | 6/19/2018 |
Location | Africa |
Scope | The company announces its need for Construction of roads to airport and inside field at Project No. K-34. The bidder/contractor shall be responsible for the complete design, construction works including labour, equipment and material supply, according to AGOCo procedure in (Turn-Key) Basis. Scope of works: Earthworks, Asphalt Pavement and Lighting for the construction of main roadway with branches (53171.00 m²) and parking lots (8035.00 m²). |
Documents Price | LD 3,000.00 |