Reference | GT15106200 |
Date | 5/28/2015 |
Location | Middle East |
Scope | Brief description of the Scope of Work is as follow: 1. 8m wide Emergency Access Road to Ummbab Sector from STP underpass to EID Musalla / Woqod including one (1) new roundabout, modification / realignment of existing roads, pipeline culvert, relocation of existing landscaping affected by road modification and street lighting works. 2. Upgrade existing track road from Khuff B to Khuff C to 8m wide single carriageway asphalt road inclusive of culvert for road crossing pipelines / flowlines. 3. Upgrade of existing track road from Fahahil Stripping Plant to FSP flare area to 6m wide asphalt road inclusive of culvert for road crossing pipelines / flowlines. 4. Upgrade of existing track road to Cuban Hospital Sewage Pump Station to 6m wide asphalt road. 5. Design and construction of new 6m wide asphalt road to the drain sump 33-T-4922 in Umm Bab Booster Pump Station including one new gate and modification of existing fencing. 6. Design and construction of crash barriers for protection of pipeline / flowline loops for 36"/12" pipeline from Station-U to Station-U1/UBMS-C, flowline near DK-633/635/644/649/333 and 18" MOL flowlines. |
Bid Bond | QAR 1,000,000.00 |
Bond Validity | 150 days |
Offer Validity | 120 days |
Documents Price | QAR 500.00 |