Reference | CMIT-PRT-10.30-180061 |
Date | 4/11/2018 |
Location | Middle East |
Scope | The company announces its need for Canteen Building Construction. The scope of work includes one-storey concrete-brick composite canteen building (about 23m length * 28m width); Cocking equipment Italian Origin indoor sewage pipeline system; indoor electrical system; indoor RO water system; indoor firefighting system; indoor HVAC system; indoor decoration and ect. |
Documents Price | US 100.00 |