Reference | CDC1714P20 |
Date | 6/17/2019 |
Location | Asia |
Scope | The company announces its need for construction of LPG recovery office building within oil main industrial area, duliajan including internal electrification and supply of all materials except. The instruments to be supplied are as follows: - - Item 001 Qty=456.70 of Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil. - Item 002 Qty=365.36 of Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. - Item 003 Qty=750.00 of Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. - Item 004 Qty=2500.00 of Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil. |
Bid Bond | INR 92,500.00 |